We helped Upstream Production Solutions reduce hull structure repair scope for the Northern Endeavour FPSO by up to 90% by replacing the default crop-and-renew approach with a risk-based strategy. Our novel FMECA-based method, approved by Lloyd’s Register, enabled monitoring and progressive repair of many defects instead of immediate repair – cutting cost, schedule, and HSE exposure.
The challenge
Hull structural defects are typically managed using prescriptive Class rules that require crop-and-renew repairs. This approach:
- Leads to high cost and schedule impact – in this case the volume of repairs required under the standard approach was simply not feasible from a budget, schedule or SIMOPS perspective.
- Involves significant HSE risk due to hotwork (e.g. welding), confined space entry and working at heights.
- Doesn’t account for defect criticality or actual risk to hull integrity.
Our solution
We developed a novel risk-based methodology using Failure Modes, Effects and Criticality Analysis (FMECA), tailored to hull structure. Our approach:
- Assessed failure severity, likelihood, detectability and operational impact for each defect.
- Used engineering calculations and FEA to demonstrate structural capacity and compliance.
- Enabled monitoring of low-risk defects instead of immediate repair.
- Was reviewed and approved by Lloyd’s Register as an acceptable alternative to crop-and-renew.
The outcome
Our strategy delivered significant benefits:
- Reduced repair scope by 40–90% across multiple tanks and the main deck.
- Cut cost and schedule impact of hull repairs.
- Lowered HSE exposure by avoiding unnecessary confined space work.
- Improved stakeholder confidence through transparent, evidence-based risk management.