Faced with widespread corrosion and integrity concerns across 73 main deck hatches on an FPSO, the client needed a solution that would avoid the cost, disruption, and safety risks of traditional steel renewals. Floating Solutions Consulting developed and implemented a risk-based engineering assessment, enabling targeted repairs and Class acceptance – delivering significant cost, time, and HSE benefits while maintaining compliance.
The challenge
The client needed to address corrosion and integrity concerns across 73 main deck hatches on an FPSO. Standard Class rules would have required extensive steel renewals, which were costly, intrusive, and operationally disruptive.
Key challenges included:
- Large number of hatches with varying conditions and incomplete inspection data.
- Prescriptive repair requirements under Class rules, regardless of actual risk.
- High potential for operational impact from traditional hot-work repairs.
Our solution
We led the project from a technical perspective, developing and implementing a risk-based methodology in close collaboration with the client, Class, and inspection and repair contractors. Our approach included:
- Reviewing Class requirements and defining a practical, risk-based assessment framework.
- Analysing inspection data to rank hatches by risk and determine fitness-for-service.
- Developing cold repair methods and mitigation actions to avoid unnecessary steel renewals.
- Coordinating with all stakeholders to ensure Class acceptance and alignment with operational constraints.
The outcome
Our approach enabled the client to maintain safety and compliance while reducing intrusive repairs and minimising operational disruption.
- Significant cost and time savings compared to traditional steel renewals.
- Reduced HSE exposure by eliminating unnecessary hot work and confined space activities.
- Class-approved methodology providing a robust, defensible basis for repair decisions.
- Only 6 hatches required offshore structural repair; the remainder were managed through maintenance and inspection.
- This enabled permanent repairs to be scheduled for the next dry dock – this was safer, more cost effective and avoided operational downtime.