Side shell inspection of FPSOs moored offshore is costly and time consuming, with rope access personnel working at height over water.

We optimised the inspection of a permanently moored FPSO by using UAV technology to capture CVI quality images of the complete side shell. This enabled subsequent rope access inspection and coating repair scopes to be optimised targeting the areas of highest risk. It also enabled the schedule and cost of the scope to be estimated with much greater accuracy.

The challenge

Our client faced significant cost, schedule and operational challenges in executing an extensive inspection campaign for the side shell of an 18-year-old permanently moored FPSO offshore Australia.

  • With no possibility of disconnecting the FPSO to return to drydock, the traditional approach would be for the work to exclusively be carried out by teams of inspectors working from ropes or platforms, at heights over water to cover the entire side shell of the vessel.
  • This posed significant HSE risks as well as conflicts with other both operations on board and available bed space.
  • Given the extents of the scope and slow nature of this type of access method, the schedule was estimated to be as long as 6-9 months, with a high degree of uncertainty given the limited detailed information available.
  • Whilst an inspection campaign informs risk, it does nothing to reduce it, and it would be some time before a subsequent coating and steel repair campaign could be implemented in order to actually mitigate risk.

Our solution

We developed a hybrid inspection scope and methodology in a staged approach, combining high-definition photography taken from an Unmanned Aerial Vehicle (UAV), followed by limited targeted non-destructive testing (NDT) and coating maintenance at specific locations by rope access personnel.

Key activities included:

  • Initially stand-off high-definition general visual inspection (GVI) images were taken with the UAV at near close visual inspection (CVI) quality.
  • These were then mapped and divided into areas classified by coating breakdown and corrosion level.
  • A pragmatic risk based prioritisation methodology was agreed with LR.
  • This was used to determine a limited number of targeted areas for manned rope access CVI and corrosion measurements.

The outcome

The client moved from being faced with a lengthy inspection campaign of uncertain duration involving significant personnel exposure to a far better defined and efficiently executed scope.

Once the initial UAV GVI results were assessed, the campaign schedule and its uncertainty margin were significantly reduced.

  • Personnel exposure from working at heights over water was reduced by approximately 80%.
  • Manning requirements were reduced due to both the reduction in duration and the UAV requiring only two personnel, versus the inspection team and crew support tying up six people.
  • Time savings enabled the inspection team to also carry out coating repairs to the worst areas of corrosion – directly reducing risk.