The challenge
WaveX, developer of a patented wave energy technology, needed to build investor confidence in their Levelised Cost of Electricity (LCOE) estimates. They engaged us for our deep expertise in full lifecycle cost and risk analysis for maritime assets.
Key challenges included:
- LCOE estimates were based on a small, first-of-a-kind deployment.
- The technology, while grounded in proven oil and gas systems, was being applied in a novel context.
- Early-stage estimates carried high cost and uncertainty.
- For successful technologies, both LCOE and uncertainty typically decline as projects mature.
Our solution
We developed an LCOE reduction waterfall chart to model how costs could evolve from development to commercialisation. Our approach included:
- Reviewing baseline assumptions behind the current LCOE estimate.
- Assessing how these assumptions would likely change over time, considering design evolution, learning curves, construction location, scaling, and O&M strategies.
- Applying these insights to model the LCOE range for a 200MW commercial-scale deployment.
The outcome
Our analysis provided WaveX with clear insights to guide both technical development and investor engagement:
- A clearer line of sight to the key cost levers influencing the technology’s economics, and their relative importance.
- A simplified, investor-friendly view of the likely LCOE range for a commercial-scale deployment.
- A foundation for strategic planning and future cost optimisation as the technology matures.