We partnered with Carnegie Clean Energy to provide a rapid, pragmatic structural review of the Ceto prototype before deployment at the Biscay Marine Energy Platform (BiMEP). Our review focused on buildability, watertight integrity and structural continuity. Our recommendations reduced complexity and de-risked construction, enabling Carnegie to proceed to fabrication with confidence.
The challenge
Carnegie sought an independent naval architecture review to validate a near-final prototype design being prepared for a two-year EuropeWave deployment at BiMEP, within a compressed schedule. The key design focus areas – electronics compartment (EC), power take-off (PTO) and hull – needed a final pass on structural details affecting buildability and watertight integrity.
- Tight review window requiring clear, actionable feedback.
- Localised details that could drive cost/complexity if left unchanged (e.g., weld access, continuity, bolting).
- Ensuring practical load paths and sealing details ahead of yard engagement.
Our solution
We ran a fast-turnaround review and workshop with Carnegie’s design team, concentrating on constructability, risk hot-spots and straightforward modifications. The work covered the EC, PTO and hull 3D models/drawings, with targeted comments classed by priority.
- Simplified and standardised details to improve continuity and weld access (e.g., bracket/mousehole use, aligned stiffeners, flange terminations).
- Adjusted sealing and fastening details to support watertight integrity and straightforward quality assurance (QA) at the yard.
- Consolidated recommendations into a clear actions list and agreed fixes in a focused workshop.
The outcome
Carnegie received an actionable set of design refinements that reduced fabrication risk and cost uncertainty, strengthened watertight integrity, and improved structural continuity ahead of builder discussions.
- Removal or simplification of higher-risk details to mitigate crack/leak initiation.
- Smoother path to construction with clearer load paths and fewer hard-to-weld interfaces.
- Increased confidence in achieving the deployment schedule at BiMEP.